Anduril to Deliver Hardware and Shelter Integration for Army’s TITAN Program
The U.S. Army has awarded Anduril a $65 million delivery order for production in support of the Tactical Intelligence Targeting Access Node (TITAN) program. The award was made through the Army Enterprise Agreement, which provides a streamlined contracting mechanism for the Army to procure Anduril products and capabilities. Under the delivery order, Anduril will produce and integrate hardware subsystems and mission shelters for TITAN, with Palantir serving as the program team lead.
Army units pull sensor data from a variety of satellites, aircraft, and ground systems. Processing and combining different forms of data traditionally relies on large, fixed infrastructure that is difficult to move and vulnerable to detection or attack. TITAN brings that capability into a mobile ground station.
TITAN fuses diverse sources of data into a common intelligence picture while in the field with combat units. This allows Soldiers to receive and act on real-time data in austere environments, rather than routing it back to a fixed command post. TITAN is designed to accelerate targeting and strike, freeing dependencies on older data processing methods.
Under the award, Anduril will deliver hardware for eight TITAN systems—four TITAN Advanced and four TITAN Basic. TITAN Advanced offers greater processing and integration capability, while the Basic variant provides greater mobility for rapid deployment.
Anduril will manufacture the ruggedized, vehicle-mounted systems and integrate the power, thermal, control, and operator subsystems that enable TITAN to function in the demanding environments in which Soldiers operate.
This award marks TITAN’s transition from prototyping to production.
Anduril has supported the program since 2021, serving as the lead hardware systems architect and incorporating Soldier feedback throughout the design and testing process. TITAN hardware is built at Anduril’s facility in Costa Mesa, California.
As the Army plans additional TITAN orders in FY27, Anduril is prepared to scale production and meet growing demand.
Read the full article here